Saudi Arabia Green Data Center Incentive Program
Incentive program offering grants and tariff reductions for hyperscale and colocation data centers adopting renewable energy and advanced cooling in Saudi Arabia.
If you’re planning to build or operate a data center in Saudi Arabia, the government wants to make it worth your while to go green. We’re talking about up to SAR 45 million (roughly $12 million USD) in grants and tariff reductions for facilities that hit aggressive efficiency and renewable energy targets.
This isn’t just greenwashing incentives for minor improvements. The program is designed to fundamentally shift how data centers operate in one of the world’s hottest climates. Saudi Arabia has ambitious goals to become a regional cloud computing hub while meeting its net-zero commitments under Vision 2030. Data centers are energy-intensive by nature, and in a desert climate where cooling is the biggest challenge, the government recognizes it needs to offer serious financial support to make sustainable operations economically attractive.
The incentive package combines upfront capital grants for infrastructure, ongoing electricity tariff discounts tied to your renewable energy use, and fast-tracked permitting that can shave months off your timeline. For hyperscale operators, colocation providers, or cloud companies evaluating where to build their next Middle East facility, these incentives can significantly improve your project economics.
What makes this particularly interesting is the timing. Saudi Arabia is investing heavily in renewable energy capacity—massive solar farms and wind projects coming online over the next few years—which means the infrastructure to actually source clean power is being built out. You’re not being asked to go green in a market where renewables don’t exist. The pieces are coming together, and this program is designed to accelerate adoption.
At a Glance
| Detail | Information |
|---|---|
| Total Incentive Value | Up to SAR 45,000,000 per facility (≈ $12 million USD) |
| Incentive Types | Capital grants, electricity tariff reductions, expedited permitting |
| Application Deadline | December 1, 2025 |
| Eligible Applicants | Data center developers and operators in Saudi Arabia |
| Key Requirements | PUE below 1.3, minimum 60% renewable energy sourcing |
| Additional Requirements | Compliance with national cybersecurity and data localization laws |
| Administering Agency | Ministry of Communications and Information Technology |
| Program Duration | Ongoing monitoring for 5+ years post-commissioning |
What This Incentive Package Offers
The SAR 45 million breaks down into several components, each targeting a different aspect of sustainable data center operations:
Capital Grants (up to SAR 20 million): This is direct funding for infrastructure investments that reduce your power usage effectiveness (PUE) and emissions. Eligible expenses include advanced cooling systems (liquid cooling, free cooling, evaporative systems adapted for arid climates), on-site renewable energy generation (rooftop solar, battery storage), heat recovery systems, and high-efficiency power distribution equipment. The grant doesn’t cover your entire capital cost, but it can offset 20-30% of the premium you’d pay for top-tier efficiency equipment versus standard systems.
Electricity Tariff Incentives (up to SAR 12 million over time): This is where the long-term value really adds up. If you commit to sourcing at least 60% of your power from renewables, you qualify for discounted electricity rates. The exact discount scales with your renewable percentage—hit 80% renewables and you get a deeper discount than at 60%. Over a five-year period, this can represent SAR 12 million or more in savings for a medium-sized facility. The tariff structure is designed to reward operators who go beyond the minimum.
Water Stewardship Support (up to SAR 7 million): In a water-scarce environment, cooling technologies that minimize water consumption are critical. This component funds investments in air-cooled systems, closed-loop cooling, greywater reuse systems, and technologies that eliminate the need for desalinated water. If you can demonstrate a cooling approach that uses minimal or no water, you’re eligible for additional grants.
Workforce Development (up to SAR 3 million): The program includes funding for training Saudi nationals in data center operations, energy management, and renewable energy systems. This isn’t just corporate social responsibility—it’s a requirement. You’ll need to show a plan for hiring and training local talent. The upside is that the government helps fund the training programs, reducing your HR development costs.
Expedited Permitting: Not a cash incentive, but potentially more valuable. Projects that meet the green criteria get fast-tracked through the permitting process, with dedicated support from the Ministry. In a market where regulatory approvals can take 12-18 months, cutting that to 6-9 months can dramatically improve your project timeline and reduce carrying costs.
Who Should Apply
This program is designed for serious data center operators, not small server rooms. You’re a good fit if you’re:
Hyperscale Operators: Companies like cloud providers, content delivery networks, or large enterprises building dedicated facilities. If you’re planning a facility with at least 10 MW of IT load, this program can meaningfully offset your infrastructure costs.
Colocation Providers: Companies building multi-tenant data centers. The economics work particularly well here because you can pass some of the efficiency savings to customers while improving your margins through the tariff discounts.
Existing Facility Operators Looking to Expand or Retrofit: The program isn’t just for new builds. If you’re operating a data center in Saudi Arabia and want to add capacity or retrofit existing infrastructure to hit the efficiency targets, you can apply for grants to support that work.
You need to be able to demonstrate technical capability and financial stability. The Ministry wants to fund projects that will actually get built and operated successfully, not speculative proposals. That means showing you have the engineering expertise, the financial backing, and ideally some track record in data center operations.
Insider Tips for a Winning Application
Start with Your Renewable Energy Strategy: The 60% renewable requirement is non-negotiable, and it’s where many applicants stumble. You need a credible plan for sourcing that power. Options include power purchase agreements (PPAs) with Saudi renewable developers, on-site generation, or a combination. The Ministry has relationships with major renewable projects and can facilitate introductions, but you need to show you’ve done your homework. Include letters of intent or preliminary agreements with renewable providers in your application.
Design for PUE Below 1.25, Not Just 1.3: The minimum requirement is PUE below 1.3, but competitive applications target 1.25 or lower. In Saudi Arabia’s climate, achieving this requires sophisticated cooling design. Consider liquid cooling for high-density racks, indirect evaporative cooling adapted for low humidity, or hybrid systems that switch between cooling modes based on ambient conditions. Show that you’ve modeled your PUE under actual Saudi weather conditions, not just theoretical scenarios.
Address Water Use Head-On: Water scarcity is a major concern for Saudi regulators. If your cooling design requires significant water consumption, you’ll face skepticism. The strongest applications demonstrate water-free or water-minimal cooling approaches. Air-cooled systems, closed-loop designs with minimal makeup water, or innovative approaches like using treated wastewater all score well.
Demonstrate Cybersecurity and Data Localization Compliance Early: Don’t treat this as an afterthought. Saudi Arabia has strict requirements around data residency and cybersecurity for critical infrastructure. Your application should show you understand these requirements and have a compliance plan. If you’re working with international standards (ISO 27001, SOC 2), explain how they map to Saudi requirements.
Highlight Local Economic Impact: The workforce development component is important to the government. Show a clear plan for hiring and training Saudi nationals, partnerships with local technical colleges or universities, and knowledge transfer programs. If you can demonstrate that your facility will create quality jobs for Saudis, not just import foreign expertise, your application becomes more competitive.
Build in Monitoring and Reporting from Day One: The Ministry will require ongoing reporting of your PUE, renewable energy percentage, water use, and other metrics. Applications that show robust monitoring systems and a commitment to transparency score better than those that treat reporting as a compliance burden.
Application Timeline
The December 1, 2025 deadline is for initial concept applications. Here’s a realistic timeline:
By February 2025: Submit your concept application. This is a shorter document (15-20 pages) outlining your project, preliminary engineering approach, renewable energy strategy, and financial model. The Ministry reviews these quarterly and invites selected applicants to submit full proposals.
March-May 2025: If invited to the next stage, you’ll prepare detailed engineering designs, finalize renewable energy contracts, complete environmental impact assessments, and develop your full application. This is the heavy lift—expect to spend 40-60 hours on the full proposal, plus significant engineering time.
June-August 2025: Submit full application and present to the Ministry’s evaluation panel. Be prepared for technical questions about your cooling design, renewable strategy, and operational plans. The panel includes engineers and policy experts who know data centers well.
September-November 2025: Negotiate final incentive agreement. The SAR 45 million is a maximum—actual awards depend on your project specifics. Be ready to discuss trade-offs and potentially adjust your design to maximize incentive value.
2026 and Beyond: Begin construction with quarterly progress reporting. Incentive payments are typically staged—some upfront, some at construction milestones, and tariff benefits begin once you’re operational and demonstrating compliance with renewable and efficiency targets.
Frequently Asked Questions
Can international companies apply? Yes, but you need a legal presence in Saudi Arabia—either a Saudi entity or a joint venture with a Saudi partner. The government prefers projects that include Saudi ownership or significant local partnership, but it’s not an absolute requirement.
What if renewable energy isn’t available in my location? This is a legitimate challenge. Not all parts of Saudi Arabia have equal access to renewable power. Your application should address this realistically. Options include working with the national grid operator to arrange renewable energy certificates, developing on-site generation, or choosing a location with better renewable access. The Ministry understands the infrastructure is still developing and will work with serious applicants on solutions.
How is PUE verified? You’ll need to install monitoring systems that track IT equipment power consumption and total facility power consumption separately, with data reported to the Ministry quarterly. Third-party audits may be required annually. Don’t try to game this—the penalties for misreporting are severe and can include clawback of incentive payments.
What happens if I don’t maintain the 60% renewable threshold? The tariff discounts are tied to your actual renewable percentage, measured quarterly. If you drop below 60%, you lose the tariff benefit for that quarter. Persistent non-compliance can trigger clawback provisions for capital grants. Build buffer into your renewable contracts so you’re not operating right at the minimum.
Can I combine this with other incentives? Potentially. Saudi Arabia has various programs for foreign investment, technology development, and job creation. Check with the Ministry about stacking incentives—some combinations are allowed, others aren’t.
What’s the success rate for applications? The program is new, so historical data is limited. Anecdotally, the Ministry is motivated to fund quality projects and has indicated they expect to approve 60-70% of full applications that make it past the concept stage. The key is demonstrating technical credibility and financial viability.
How to Apply
Ready to pursue this incentive? Here’s what to do:
Step 1: Review the full program guidelines on the Ministry of Communications and Information Technology website. Make sure you understand the technical requirements, compliance obligations, and reporting expectations.
Step 2: Assemble your team. You’ll need data center engineers, renewable energy specialists, legal counsel familiar with Saudi regulations, and financial modelers. This isn’t a one-person application.
Step 3: Develop your preliminary design and renewable energy strategy. Get far enough into the engineering to credibly estimate your PUE and demonstrate feasibility.
Step 4: Reach out to renewable energy developers in Saudi Arabia to explore PPA options or partnership opportunities. Having preliminary agreements strengthens your application significantly.
Step 5: Prepare and submit your concept application by the deadline. Focus on clearly articulating your value proposition, technical approach, and why your project deserves support.
Visit the official program page for detailed guidelines and application portal access: https://www.mcit.gov.sa/